







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Home Additions & ADU: The Vallejo Owner’s Guide
We build and finish IKO-spec home additions and ADUs in Vallejo, and a turnkey addition here typically lands between $45,000 and $130,000 installed, with detached ADU construction running $90,000 to $220,000. That’s the honest range before a site visit, and it’s the range we hold to in a written scope. Most Vallejo owners don’t go looking for this work because a part “failed” – they go looking because a converted garage or a half-finished addition is showing water at the roof deck, a wall that won’t hold a survey line, or an IKO underlayment system that’s already breaking down under our wet-winter, dry-summer swing. If that’s where you are, you’re in the right place. We’re an independent contractor, not affiliated with IKO, and we build to IKO’s published specs when the assembly calls for them.

Which IKO Models This Applies To

IKO’s role in a Vallejo addition is almost always the roof and weather-barrier layer – their shingles, underlayments, and ventilation components – not the framing. So “which model” really means matching the assembly to the product line. IKO’s shingle families differ in wind rating and mat construction, and their underlayment lines split between synthetic and felt-based systems that behave very differently on a low-slope addition roof in Vallejo.
To identify what you have, check the bundle wrapper for the product name and the tear-off or drip-edge label, then measure the exposure (the visible height of each shingle course) – that number tells you the series faster than any photo. The OEM-versus-aftermarket call matters here: IKO’s own underlayments and accessory components are made to work as a system with their shingles, and mixing brands at the deck can void a manufacturer warranty. Where a compatible third-party component is allowed, we say so in writing and name it in the scope. Our technicians have up to 22 years of experience reading these assemblies, and we spec the tradename so it’s traceable.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Home Additions & ADU Is Failing
Here’s what usually shows up first in a Vallejo addition or ADU, and what’s actually causing it:
- Granule loss collecting in gutters and at the drip edge. The shingle mat is aging faster than the surface, often because ventilation is undersized for the addition’s low-slope section. You’ll see grit in the gutter after a dry stretch.
- Curling or lifted shingle tabs on the south-facing plane. Vallejo’s summer sun bakes that side, and without adequate attic venting the deck reaches temperatures that shorten shingle life well below the rated window.
- Water staining at the wall-to-roof junction. Flashing detail at the addition’s tie-in to the main house is where most failures start. The underlayment may be fine and the flashing wrong.
- Soft spots or a spongy feel near the valley. This is decking or substrate decay, not a top-layer problem. It needs to come apart before it spreads into the framing.
- Ice-dam-style staining in our wet months. Vallejo’s rain events are short and heavy. A failed underlayment seam lets water track sideways under the shingles and show up at a ceiling far from the actual breach.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
An addition or ADU project in Vallejo runs $45,000 to $130,000 for a home addition, $90,000 to $220,000 for ground-up ADU construction, and $30,000 to $80,000 for a garage conversion. What moves the number: square footage, whether the foundation is slab or raised, the roof assembly you choose (IKO shingle system versus a low-slope membrane), and how much site work Vallejo’s older lots demand. We write a line-item price before any work starts – parts, labor, permits, and the weather-barrier layer spelled out by name. The roof and substrate work we complete carries the 365-Day Done Right Promise: if it fails inside that window, we return and correct it at no charge. No numbers that move at the door.
DIY or Call Us?
There’s an honest line here. You can safely check the bundle wrapper, measure shingle exposure, and look for grit in the gutters. You can photograph the flashing at the tie-in. What you shouldn’t do yourself is open a roof deck, replace a valley, or re-flash a wall-to-roof junction – that’s high-height work with a real fall risk, and a wrong flashing detail will cost more to fix than the original job. Structural tie-ins on an addition are the same story. If you’re unsure which layer failed, call us at (844) 560-4789 and we’ll tell you what to look at first. Our technicians are background-checked and uniformed, and a live person answers the phone around the clock.
FAQs

Roughly 15 to 25 years for a properly ventilated IKO shingle system, shorter on low-slope sections with poor airflow. Vallejo’s hot, dry summers age the sun-facing plane faster than the north side, so expect uneven wear. Call (844) 560-4789 for an inspection and a written estimate.
Sometimes – a localized flashing fix or a single damaged shingle run is often a repair, not a full replacement. Once granules are gone across a whole plane or the deck feels soft, repair stops being the honest answer. We’ll tell you which one you’re looking at before any work starts.
A roof-assembly replacement on an addition typically takes a few days depending on size; a full addition or garage conversion measured in weeks, not days. We give you the schedule in writing up front. Call (844) 560-4789 to schedule your free estimate.
We specify IKO by tradename in the written scope and source through documented supplier channels, so the components in your assembly match what we put on paper. We don’t claim to carry stock – we order to the job. Call (844) 560-4789 and we’ll walk you through it.
Written by the team at Bradford Remodeling Co Vallejo, serving Vallejo and nearby areas.












