Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Vallejo Owner’s Guide
If you’re adding onto a home in Vallejo, a CGI home addition or ADU is a site-built structure, not a bolted-on part, so “replacement” means the full build: a home addition runs $45,000 – $130,000 installed, and a detached ADU runs $90,000 – $220,000. A garage conversion, the cheapest route to an ADU here, runs $30,000 – $80,000. There’s no same-day version of this work. It’s design, permits, inspections, and a documented scope. What fails first is almost always the paperwork and the plan, not the lumber.

Owners usually discover the problem mid-project. A framing plan drawn for a mild climate. A permit set that misses Vallejo’s graded hillside drainage requirements. A budget that looked fine until the soil report came back and the foundation line item doubled overnight. We see the same three failures on nearly every addition we take over from another contractor, and we write the number down before the first tool comes out.
Key Takeaways
- Home additions in Vallejo: $45,000 – $130,000. Detached ADUs: $90,000 – $220,000. Garage conversions: $30,000 – $80,000.
- Most failed projects start with an incomplete plan set or a permit scope that didn’t match what was built.
- Vallejo soil, slope, and drainage drive foundation and site costs more than any finish decision.
- Every Bradford project gets a written price before work starts and the 365-Day Done Right Promise at close.
Which CGI Models This Applies To

CGI builds site-specific additions, so “which model fits” is a design question, not a catalog lookup. What matters is what your property allows. In Vallejo, that starts with your lot’s zoning and your parcel’s slope. Homes on the hillsides above the Solano County waterfront face different setbacks and drainage requirements than flat lots in the older neighborhoods off Tennessee Street. Pull your plat map and your zoning designation before anyone draws a line.
If your build requires matching the existing structure, the brand of your existing materials is the key to the match. We work from a documented roster so the specifications are traceable: KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, and Therma-Tru doors. That means the addition’s roof, siding, and trim are specified against manufacturer standards, not guessed at.
The OEM-versus-aftermarket decision doesn’t apply here the way it does for a mechanical part. For an addition or ADU, the real decision is contractor versus owner-builder, and the honest answer is that owner-building an ADU in Vallejo usually costs more in time, permit cycles, and rework than it saves.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
- The permit set doesn’t match what’s being built. Contractors who revise scope on the fly often don’t revise the plans. This shows up at the first inspection, when the framing doesn’t match the approved documents. The fix is a correction cycle that stops work for weeks.
- Foundation cracks or floor slope in the new addition. Vallejo’s expansive clay soils move with our wet and dry seasons, and a footing sized for a gentler climate will settle unevenly. Hairline cracks are normal. Cracks you can slip a coin into, or a floor that feels sloped when you walk it, are not.
- Water pooling against the new footprint. Additions change where rainwater goes. If grading wasn’t corrected to slope away from the structure, water sits against the foundation through the rainy months and finds its way in.
- The addition pulls away from the original house. A failed tied-in joint – the point where the new structure attaches – shows up as a visible gap, persistent draft, or a crack running down the seam. It usually traces back to a footing or connection that was underbuilt.
- The written scope and the invoice don’t agree. Change orders arriving after work starts, with numbers that weren’t discussed, are the most common complaint we hear from owners who’ve been through a bad project. A written price and signed scope before work begins prevents this entirely.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s the honest range for Vallejo, installed:
| Project Type | Installed Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| Detached ADU Construction | $90,000 – $220,000 |
| Garage Conversion to ADU | $30,000 – $80,000 |
What drives the number: square footage, foundation type (slab versus raised and pierced by slope), the site work for drainage on hilly Vallejo lots, and how much of the finish is included. A garage conversion stays at the low end because the shell, slab, and roof already exist. A detached ADU hits the high end when it needs its own utilities, kitchen, and full bathroom brought out to the site.
Every Bradford price is written before work starts, itemized, with no figures that move at the door. Permits are pulled, inspections are passed, and the completed work carries the 365-Day Done Right Promise – if anything fails within that year, we return and correct it at no charge.

DIY or Call Us?
An addition or ADU isn’t a part you swap in an afternoon. There’s no safe DIY middle ground here. What you can do safely: pull your property’s zoning and setback information, confirm your utility service capacity with PG&E, and photograph the current condition and any existing cracks or drainage issues. Those records help any contractor give you a more accurate number.
Where it goes wrong: cutting into a foundation or roofline without engineering, skipping the permit, or self-managing trades you’ve never coordinated. The cost of redoing a foundation that was poured on the wrong footing, or tearing out a structure that failed inspection, routinely exceeds the project’s original budget. On a five-figure build, a misstep isn’t a trim piece you replace; it’s a wall that has to come down.
We walk you through the scope, price it in writing, and identify independent local professionals who do the work. Bradford Remodeling Co Vallejo is an independent service provider and is not affiliated with CGI. We connect you with local crews and hold every project to The Garrison Standard.
FAQs

A well-built addition will last the life of the house it’s attached to – 50 years or more – provided the foundation matches the soil, drainage is correct, and the roof holds. The variables that cut that short are all fixable up front: undersized footings, poor grading on a sloped lot, and skipped inspections. Get those right at build time and a Vallejo addition outlives its owners. Call (844) 560-4789 for a free estimate that prices those specifics.
Often, yes. A settlement crack can sometimes be underpinned, a tied-in joint can be repaired and sealed, and drainage can be corrected without tearing down the structure. The determining factor is whether the foundation and framing are structurally sound. If they are, repair is more economical than replacement. If they’re not, a rebuild is the honest answer – and the cost of a repair that doesn’t hold is double.
A garage conversion to an ADU on a straightforward Vallejo lot is typically the fastest route, at several months once permits are secured. A full addition or detached ADU takes longer, with permit review and inspections driving much of the timeline. No contractor can shorten the permit cycle, and any number given before plans are drawn is an estimate.
We work from a documented roster of manufacturer brands, so every product has traceable specs and manufacturer warranties that back our own 365-Day Done Right Promise. That includes KraftMaid and Wellborn cabinetry, Cambria and Caesarstone surfaces, and Kohler and Moen fixtures for interior work, plus GAF and James Hardie exterior products. We also work with KraftMaid, Cambria, Silestone, and other names in that roster. We don’t carry parts on trucks, so the sourcing happens at quote time with the specific model numbers in writing.
When you’re ready to price a Vallejo addition or ADU, call us at (844) 560-4789 for a free estimate. A live person answers around the clock, we put the price in writing before any work starts, and the finished project is backed by the 365-Day Done Right Promise. Background-checked, uniformed technicians arrive on schedule, and the site gets left clean at close.