







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Home Additions & ADU: The Vallejo Owner’s Guide
We build and install Mr-Glass home additions and ADUs in Vallejo, and a typical finished addition runs $45,000 – $130,000 depending on square footage, foundation, and finish level. An ADU as a standalone structure typically runs $90,000 – $220,000, while converting an existing garage lands between $30,000 and $80,000. We give you that number in writing before any work starts.

Owners usually discover a problem with this kind of build long before the finish work. It shows up as a door that won’t close square in a new addition, a hairline crack above a header, or a floor that’s grown a slight slope since framing. Sometimes it’s the opposite: the addition was designed and permitted but the shell sat through a wet Vallejo winter, and the subfloor – the layer the finished floor rests on – took on moisture. Either way, the failure is almost never cosmetic. When the building envelope or the framing moves, you need an experienced eye, not a coat of paint.
Key Takeaways
- Mr-Glass home additions in Vallejo: $45,000 – $130,000 installed.
- ADU construction: $90,000 – $220,000. Garage conversion: $30,000 – $80,000.
- Every price is written before work begins, and the work is covered by our 365-Day Done Right Promise.
- We’re an independent contractor. We’re not affiliated with Mr-Glass, and we don’t carry parts or stock components on a truck.
Which Mr-Glass Models This Applies To

Mr-Glass additions and ADUs come in several configurations, and the building system matters because your foundation, framing method, and finish dimensions all get set by it. If you can find the plan set or the model label on your permit paperwork or the inside of the panel, bring it to the estimate. That label tells us the series, the floor system, and the wall thickness. Without it, we measure the existing shell directly: plate heights, stud spacing, window rough openings, and the slab or pier layout underneath.
Here’s the compatibility gotcha most owners miss. Mr-Glass additions are engineered around a specific floor deck and wall panel combination, and the specs change between model lines. Swap one component for a “close enough” aftermarket piece and your load path – the way weight travels from roof to foundation – no longer matches the plan. Match the series first, then the part.
On the OEM-versus-aftermarket question: for structural components, we spec original-spec or a documented equivalent with published load ratings, never a generic substitute. For finish items, a quality aftermarket cabinet or surface is fine, and we work with KraftMaid, Cambria, and Silestone as a matter of course. We don’t stock Mr-Glass parts and nothing rides on a truck, so anything original-spec is sourced to your plan set. Our technicians have up to 22 years of experience reading those plans.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Home Additions & ADU Is Failing
- Doors and windows that won’t close square. This usually points to framing that shifted or a header undersized for the opening. If it’s new since last season, the cause is settling or moisture in the structure, not the door itself.
- Hairline cracks above openings or at wall corners. These track to foundation movement or framing that took on water before it was closed in. A single hairline is common; a widening crack is a signal to stop and get it looked at.
- Soft or springy floor spots. The subfloor absorbed moisture – Vallejo’s winters are wet enough to do it if a shell sits open or a moisture barrier was skipped. Left alone, it rots the framing under the finish floor.
- Sagging roofline or a gap at the wall tie-in. Where the addition meets the original house, a gap or sag means the connection wasn’t flashed or tied correctly. That’s a water path into both structures.
- Musty smell or stains at the base of walls. Water is entering somewhere the envelope wasn’t sealed – a common issue in additions built through a rainy season. Drywall stains are the visible symptom; the sheathing behind it is the real problem.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Vallejo, honest installed ranges look like this:
| Project | Installed Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What drives the number: square footage, foundation type, whether utilities need a new rough-in – the plumbing and electrical routed inside the walls before they close – and finish level. Permits and inspections are part of the scope; we pull them and meet them. You’ll get a written, line-item price before a single tool comes out, and that number doesn’t move at the door. Every completed project carries the 365-Day Done Right Promise: if the work fails inside that year, we come back and correct it at no charge. That guarantee is in writing, in your hand, at job close, along with a clean site and a documented scope.
DIY or Call Us?
There are things you can safely do yourself. Check the plan set, photograph the cracks and gaps, note where doors and windows stick, and feel for soft spots in the floor. That’s information useful to a contractor. What you shouldn’t do is open a wall, cut into framing, or try to correct a foundation or load-path issue on your own. An addition carries the roof and walls of the house attached to it, and mistakes here turn into structural failures that cost far more than the original repair. If you smell gas near a utility tie-in or see active water intrusion, stop and call. We answer the phone live, 24/7.
Our technicians are background-checked and uniformed, and on a build like this discipline isn’t optional: clean site, documented scope, signed written guarantee when we’re done. That’s The Garrison Standard, and it’s how we run every job in Vallejo.
FAQs

A properly built addition should hold for decades – the structure is only as good as its foundation, flashing, and moisture control. In Vallejo’s wet winters, water management is what decides whether it lasts 20 years or fails early. If you’re seeing symptoms now, get them inspected before the next rainy season. Call (844) 560-4789 for a free estimate.
Often, yes. A sticking door, a single hairline crack, or a localized soft spot can frequently be corrected without tearing out the addition. The deciding factor is whether the load path or the building envelope has been compromised. An inspection tells you which side you’re on. Call (844) 560-4789 and we’ll look at the specific issue.
A garage conversion typically runs several weeks; a full addition or standalone ADU runs months, and the schedule depends on permits, inspections, and weather. We give you the timeline in writing with the price, and we don’t move it without telling you why. Call for a free estimate and a real schedule.
We source original-spec components to your plan set, or a documented equivalent with published load ratings, and we never substitute a generic part for a structural one. We don’t stock parts or carry inventory on a truck, so everything is specified to your project. Call (844) 560-4789 and bring your plan set to the estimate.
Before you sign anything with anyone, get the price in writing and read what the guarantee actually covers. We’ll give you both, free. Call (844) 560-4789 for a free estimate on your Mr-Glass home addition or ADU in Vallejo.
Written by the team at Bradford Remodeling Co Vallejo, serving Vallejo and nearby areas.












