







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Home Additions & ADU: The Vallejo Owner’s Guide
We build and finish Unilock-clad home additions and accessory dwelling units (ADUs) in Vallejo, and a complete Unilock addition typically runs $45,000 – $130,000 installed, while a full ADU build runs $90,000 – $220,000. When we say a Unilock “part” on a structure like this, we mean the hardscape and wall components themselves: retaining wall blocks, caps, pavers, steps, and the drainage pieces that keep water moving away from your foundation and away from Vallejo’s expansive clay soils. Owners usually find out something is failing the same way we do. A block face spalls or cracks after a wet winter. A cap stone rocks underfoot. Efflorescence (that white mineral bloom) keeps comeing back no matter how you scrub it. A wall face starts to bulge after heavy rain, or a step settles a quarter inch and throws off the door threshold above it.

Which Unilock Models This Applies To
Unilock systems are family-based, and picking the right replacement part means matching the family and the profile, not just eyeballing a block at the hardware store. The wall and paver families you’ll most often see on a Vallejo addition or ADU are Brussels Dimensional Stone and Brussels Block for retaining and freestanding walls, Pisa2 and Olde Quarry for wall faces, Beacon Hill for a smooth flat wall face, and Accent or Holland pavers on steps, landings, and driveway aprons. Caps have their own line (Brussels, Ledgestone, and others), and a cap from one family won’t sit correctly on a wall built from another. The reliable way to identify your part is to check the original project documents, the contractor’s submittal sheet, or the delivery slip. If those are gone, we measure the block’s face dimensions, height, and the depth of the interlock lip and match it against the current family spec sheet. On Unilock specifically, we lean toward genuine Unilock replacement pieces wherever the family is still in production. The piece has to hit the same engineered profile and the same color run as the original to lock and drain correctly. A generic block that looks close but sits a few millimeters off will pass a glance test and then fail at the first freeze-thaw cycle.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Unilock Home Additions & ADU Is Failing
- Spalling or cracked block faces. Water gets into the block, freezes, and pops the surface. In Vallejo this tends to show up after a wet January on walls facing the prevailing weather, and it means the sealer or the block itself has given up.
- White efflorescence that returns. That mineral bloom is salt wicking out of mortar or the block. If it keeps coming back, moisture is getting in from behind the wall, usually from missing or clogged drainage.
- Rocking or loose caps. Cap adhesive fails and the cap lifts, which lets water straight into the wall core. Once a cap is loose, the wall behind it is taking on water.
- Bulging or leaning wall face. This is a base or drainage failure, not a cosmetic one. A retaining wall that leans past the manufacturer’s tolerances needs to come apart and be rebuilt on a proper base with the right drainage stone.
- Settled steps or a door threshold that catches. The step base under the paver has compacted unevenly. On an ADU this throws off the door swing and the threshold seal, which then becomes a water-intrusion problem.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s the honest split for Vallejo. Structural work on an addition or ADU is priced as a project, and it’s the number that matters most:
| Scope | Installed range in Vallejo |
|---|---|
| Home addition (Unilock-finished) | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
What drives the number up or down: square footage, whether you’re going up or out (adding a second story over an existing footprint costs more per square foot than a single-story bump-out), foundation work, plumbing and electrical rough-in distance from existing services, and how much hardscape and retaining wall you’re tying into the build. On the parts side, replacing a run of caps or a settled step section is a smaller job we bid as a line item. Every project gets a written price before any work starts. No numbers that move at the door. All completed work is covered by our 365-Day Done Right Promise: if the work fails inside that year, we come back and correct it at no charge.
DIY or Call Us?
Replacing a paver on a flat patio is fair game for a careful homeowner. Rebuilding a retaining wall or resetting a step on a structure that carries a roof and a floor load is not, and here’s why: a retaining wall is holding back soil and water, and if the base and drainage aren’t rebuilt correctly, the wall fails again within a season. On an addition or ADU, a cap or step failure often signals a moisture path that reaches the interior, so the fix is diagnosis first. What you can safely check: whether caps are loose (hand-turn test), whether efflorescence returns after dry weather, and whether a step rocks when you step on it. Photograph what you find, then call us at (844) 560-4789. Our technicians have up to 22 years of experience with Unilock systems and the wet-winter, clay-soil conditions here in Vallejo. Note that we’re an independent contractor and not affiliated with Unilock.
FAQs

How long should a Unilock addition last? With a proper base, correct drainage, and the right sealer, the hardscape components on an addition should hold for 20 years or more. In Vallejo the limiters are drainage and water, not the block itself: walls that stay dry behind the face last far longer than walls that trap water.
Can it be repaired instead of replaced? Often, yes. A single loose cap, a settled step, or a run of spalling blocks can be repaired as a line item without tearing out the whole structure. The repair only holds if we fix the underlying moisture or base cause. Call (844) 560-4789 for an exact quote, and estimates are free.
How long does the swap take? A cap or step repair is usually a one- to two-day job once the right Unilock pieces are on site. A retaining wall rebuild or step reset takes longer, and a full addition or ADU runs as a multi-week project with a written schedule. The parts itself isn’t the slow part, finding the correct family match is, so get us the submittal or photos early.
How do you source the part? We match the Unilock family and profile from your original submittal sheet, delivery slip, or field measurements, then order the genuine replacement pieces wherever the family is still in production. When a family is discontinued, we source the closest current profile the manufacturer still runs and rework the adjoining pieces so the wall and drainage still perform. We don’t carry parts on a truck. Pieces are ordered to spec for your job. We also document the brand and spec at install time on KraftMaid, Cambria, and Silestone lines, so your whole home stays traceable.
If you’ve got a failed cap, a leaning wall, or a step that’s throwing off a door, the next move is a free estimate. We’ll inspect the parts you have, tell you honestly whether it’s a repair or a rebuild, and hand you a written price before any work starts. Calls are answered by a live person 24 hours a day, so call (844) 560-4789 and let’s get it squared away.
Written by the team at Bradford Remodeling Co Vallejo, serving Vallejo and nearby areas.












